Nolen Drive Connector

The Nolen Drive Connector was substantially completed and reopened to traffic on June 27, 2019, and connects Nolen from South Kimball to Exchange. The approximate budget was $450,000 in shared costs between the City of Grapevine and the City of Southlake.

Nolen Drive Connector