SH 114 Frontage Road Improvements

Project Background

This project kicked off in 2018 as an initiative to complete the connection of the SH 114 frontage road from Southlake to Trophy Club. The eastbound and westbound frontage roads currently end as they approach Dove Road and start back up near Kirkwood Blvd. It will provide commuters with a continuous alternate route from Grapevine to Southlake to Trophy Club. This will reduce drivers' need to re-enter the Dove Road highway and exit again at Kirkwood Boulevard to continue on the frontage road. 

This project includes the following improvements: 

  • Extension of eastbound and westbound frontage roads (as shown on the map)
  • Exit and entrance ramp reversal to prevent unsafe merging behavior on the main lanes of the highway. TxDOT is taking this approach to highway ramps on its facilities statewide. 
  • Installation of Texas turnarounds at Kirkwood/Solana Boulevard and Dove Road

This TxDOT frontage road project is expected to be entirely constructed and open by summer 2024.

State Highway 114 Frontage Road Overview
  1. Public Works - Administration

    Physical Address
    1400 Main Street
    Southlake , TX 76092


Got a Question?

  1. Mobility Mailing List white Sphere Orange Icons small