Substantial Completion

In a residential sub-division, at substantial completion, the City will release ten percent (10%) of the total lots to the Developer for construction.

In order for a project to be considered substantially complete, the following must be met:
  • All streets must be accepted
  • All traffic signs and street signs must be installed
  • All lighting must be installed and operable
  • All water, wastewater, and drainage systems must be tested and accepted