Final Acceptance

All of the following are required for final acceptance of the project:

  • A final inspection must be performed involving personnel from Engineering, Water, Wastewater, and Streets & Drainage Departments
  • Successful completion of the acceptance requirements outlined in the Project Checklist;
  • A completed Donated Asset Form
  • Two (2) bond sets and one (1) electronic copy of the Record Drawings in .tiff format shall be submitted to the Public Works Project Manager
  • The City must be reimbursed for all inspection overtime attributed to the project